September 8, 2016

Cable Plant Survey

  1. Cable Plant Survey – Detailed analysis and testing of existing cable plant (fiber and copper). Upon completion, we will provide the following documents in electronic and hardcopy:

 

Approximately 2 – 4 weeks after completion of Survey:

  1. Survey Assessment (PDF document detailing our analysis of your cable plant “As-is”, and recommendations for remediation of failures)
  2. Test Results (Document detailing the performance of your cables [success or fail] and cause of failures)
  3. Photographs (Comprehensive collection of photos to thoroughly document the state of your cable plant, connections, and fire-code violations)